Specs that can be
checked.
Write requirements the way you already do. fastverk turns each one into a typed claim in a graph, finds the conflicts that no single document mentions, and won't accept a reference to a proof that doesn't exist. This part is in early access: the checks run today, and we're building the rest with a few design partners.
| limit | team | where it comes from | can bend? |
|---|---|---|---|
| ≥ 82 MW | market | capacity commitment | at a price |
| ≤ 78 MW | thermal | OEM derate at 45 °C | no |
| ≤ 70 MW | fire safety | state-of-charge window ÷ 4h | no |
| ≤ 55 MW | warranty | throughput budget, 80% spent | binding |
Two things worth knowing.
How a requirement becomes something you can check.
MUST, SHOULD and MAY become data. The important words have to point at something real. Numeric limits from different teams get intersected, and an empty intersection is reported with the evidence.
Claims and conflicts → proofs and changesProofs, and how a spec changes.
A claim only counts as proven if a Lean theorem compiles behind it. Every change to the spec is a proposal with a content hash, checked before it's accepted, and replayable.
Proofs and changes →We keep a plain list of what's built today and what's next →
Try it on one document.
Send us a requirements doc. We'll show you what it says once it's data, including the conflict it doesn't mention.