proofs and changes

Proofs, and how a spec changes.

A claim counts as proven only when a theorem compiles behind it. The job of the check is to make sure nobody can say otherwise.

proofs

You can't fake a proof.

A claim can point at a Lean 4 theorem. The check resolves that pointer, confirms the theorem exists and has no sorry in it, and keeps a ratchet on which axioms proofs are allowed to use, so the trusted base can only shrink. Point at a theorem that was never proved and the build fails. Today only a handful of claims carry proofs. That's the honest number, and the check is what keeps it honest.

changes

There's one way to change a spec.

A change is a proposal made from a fixed set of operations. It's named by the hash of its contents, checked before it's accepted, and appended to a log you can replay byte for byte. A check that looked at zero records is refused before anything is written, so it can never be recorded as a pass.

agents

What an agent gets from a spec.

From the graph, fastverk derives work orders for agents: the obligations in scope, the grounded glossary, a budget, and a content hash of the exact spec version. If a work order's scope touches an open conflict, it's held until a person resolves the conflict. This is where specs meet the agent platform. The budget the scheduler enforces comes from the same claims the checks validated.

for the whole team

The console counts what's still vague.

People who aren't engineers write and ground requirements in a hosted console. Engineers run the same checks in their own CI with one dependency. The overview is a funnel rather than a score: how many requirements are written down, broken into terms, tied to real data, and measured. Values illustrative.

133
written down
requirements in the graph
107
terms
words that have to point at something real
12
open conflicts
owned and adjudicable, never a build failure
4
work orders
derived for agents, held while a conflict is open

Next: what's built today, and what's next →·proofs in the agent platform →